Here are some photos of the shop construction.
Trenching for under floor piping.
Installing sawdust vacuum pipes.
Note the supervisor with the coffee cup.
A lot of Concrete.
A total of 4 truck loads.
The Floor is complete.
Now my work begins. I will build the shop building alone. (Lord willing)
The walls start going up.
It's tough being old and fat.
The walls continue to go up.
These walls are t a l l !